Filtration and pump applications for industry, municipalities, or hotels – Amollo Water Technology GmbH finds the right solution.We offer innovative concepts for filtration-based water treatment.
With over 15 years of experience, we specialize in the construction, renovation or expansion of existing membrane and other filtration systems. For industrial and municipal applications, the regulations of the Water Resources Act and the German Drinking Water Ordinance are binding.
The design and construction of reverse osmosis systems for seawater desalination are the core expertise of Amollo Water Technology GmbH.
Whether new construction or refit – we design and implement customized seawater desalination solutions tailored to your specific requirements. With over 15 years of experience, we stand for customized systems and reliable performance.
Learn moreTo ensure that your water treatment system operates reliably in the long term, we offer you not only remote monitoring but also a reliable supply of spare parts and the delivery of precisely matched operating materials and chemicals.
Renewal of High-Pressure Pumps During Ongoing Operation
In an island water plant with two redundant reverse osmosis systems for seawater desalination, the central high-pressure technology was getting on in years. The pumps used were technically outdated, and spare parts were either very hard to find or no longer available. Repairs were time-consuming and costly. In addition, the high energy consumption of the existing system led to rising operating costs.
A complete replacement of pump technology was urgently needed. At the same time, the ongoing operation of the water treatment had to be ensured at all times – shutting down the system was not an option. In addition, relocating the new pumps to a different location within the facility presented both a planning and technical challenge. A solution was needed that was both well thought out and could be implemented with logistical precision.
The implementation was carried out using ready-to-connect racks, in which the new high-pressure pumps, along with all necessary valves, were delivered pre-assembled together. This allowed for an efficient and time-saving replacement. In addition, an energy recovery system was integrated which significantly reduces energy consumption and increases the efficiency of the system in the long term. The installation was precisely arranged to ensure that operations could continue without interruption.
The modernization led to a noticeable reduction in energy consumption. The replacement was completed on schedule and without any downtime. The thoughtful and technically convincing implementation of the project earned an award from the customer.
Our solutions are as unique as your requirements. Feel free to call us or contact us via our contact form to schedule a consultation. Whether it is a new build, modernization, or optimization of existing systems – together we will develop customized concepts precisely tailored to your needs.
Contact Us Now